WindMit WriterOIR-B1-1802 · Rev. 04/26

Field notes · not a template store

Why a consistent 1802 job sheet matters

A wind-mitigation inspection is a short visit with a long paper trail. The published OIR-B1-1802 Rev. 04/26 has a fixed section order, a photograph rule on questions 2–9, and a signature block that has to match the person who actually walked the property. A new Word file, a marked-up last-job PDF, and a phone camera roll named IMG_4471 will still produce a packet — until one job is missing a permit date, a photo tagged to the wrong question, or a revision that is no longer live.

A consistent job sheet is not “software instead of inspecting.” It is the same empty form every morning, so the only variable is what you saw.

What consistency actually protects

What a job sheet should refuse

A good sheet is boring on purpose. It should not offer “recommended clips for this roof,” a Citizens-accepts toggle, or a Florida Building Code lookup that pretends to pick A versus C for you. Those are consulting. They do not belong next to the published boxes. If a tool answers them, you are no longer filling OIR-B1-1802 — you are taking advice from a vendor who will not be on the stand with your HI number.

When $49/month is the wrong spend

If you write two 1802s a year and already keep a clean Rev. 04/26 PDF plus a naming scheme for photos, stay on paper. If you already pay for a full inspection suite and the 1802 is a module you use, you may not need another login. WindMit Writer is for the inspector whose product is the wind-mit / 4-point visit and who wants the current revision, tagged photos, and a Polar receipt — not a second opinion on the roof. Read how the product fits and what it will not do before you subscribe.

Subscribe — $49/monthOpen the job sheet